projects
bóng đá cá cược Signature Show area
The main contractor for the rough construction
Address Mediterranean town, South Phu Quoc Investor Mat Troi Phu Quoc Co., Ltd (Sungroup) Scale
The project has piles and foundations located below sea level, including one pump room floor with an elevation over 5 meters lower than sea level; 1 technical basement for equipment operation; 1-floor water tank and a 10,000 square meter performance stage.
Construction time April 2022 Completion date September 2022

